Customer
:
Address
Email ID
Contact person
Department
Contact number - Landline
Mobile
I Part Analysis
a. Part material
b. Part geometry & surface condition drawing / component may be sent
II Soil Analysis
a. Soil to be removed
:Chips Lapping paste Oil Grease Dirt Grinding swarf
b. Soil level
:Light Medium Heavy
III Cleaning Process
a. Cleanliness level required :
Visually clean
Measurable
Others (specify)
b. Dryness level required :
Fully dry
Partially dry
Not required
c. Will a certain temperature of the part affect the next operation?
d. Is a rust inhibitor required
e. Will water based solvent create any problem, on the component finish
IV Part Orientation
a. How will the part enter the machine area
b. Does the part have a fixture?
c. Will it come one by one, or in batches in pallets?
d. If in batches, how many per pallet?
e. Does it have cavities which will trap
solvent
V Part Handling
a. Preferred method - conveyor, trays, bins
pallets, baskets etc
b. Manual or automatic
c. Has it to flow through or return to operator
d. Is part to part contact during cleaning
acceptable
VI Production Volume
a. Number of pieces to be cleaned per hour
b. Number of working hours per day / shift
for cleaning
c. Future production increase expected
VII Floor Space Requirements
a. How much floor space is available
No limitation
Limited to
b. Space for service purpose available around
the machine area
c. Are all necessary utilities like water, electrical, steam and air available
VIII Type of Machine Required
a. Manual
b. Semi automatic
c. Fully automatic
VIII Budget
a. Specify budget limit, if any
X Delivery
a. Machine required - latest by (Specify)
Additional information
Upload drawings